Commissioning Checklist

A practical commissioning checklist covering preparation, testing, escalation, and close-out with clear sign-off.

Cover image for Commissioning Checklist

Download your commissioning checklist

Please fill out the form below to access your free commissioning checklist download.

About this commissioning checklist

Commissioning is where small misses turn into big problems — downtime, repeat visits, safety risk, and a handover nobody trusts. This commissioning checklist gives operations teams a clear, repeatable way to prepare properly, verify what matters during testing, escalate at the right time, and close out with evidence.

Use it for new installs, replacements, upgrades, and recommissioning after downtime. The goal is simple: stop guessing and start knowing the asset is safe, configured correctly, and ready for real-world use.

What this commissioning checklist covers

  • Preparation checks (safety, permits, prerequisites, documents, tools)
  • In-process checks (installation verification, configuration, functional and safety testing)
  • Escalation criteria (clear stop points to prevent risky “push through” decisions)
  • Close-out actions (documentation, handover, open actions, sign-off)

When to use it

Run this checklist any time you need confidence that equipment, systems, or site changes are ready to operate. It’s especially useful when:

  • Different people install and commission
  • You rely on third parties or site dependencies (power, network, utilities)
  • There’s pressure to hand back quickly
  • You need consistent evidence for compliance, audits, or warranty

How to use it on the frontline

Keep it simple. Work top to bottom, capture notes where something isn’t straightforward, and attach evidence for key tests. If you hit a stop point, pause and escalate — the checklist makes those moments explicit so you don’t have to rely on judgement alone.

Tip: treat “not sure” as a real answer. Uncertainty is usually a missing dependency, an outdated document, or a configuration mismatch — and it’s cheaper to find that early than after go-live.

Common escalation triggers

If any of these show up, stop and raise it:

  • Safety controls aren’t in place (or can’t be verified)
  • Permit, isolation, or lock-out tag-out issues
  • Acceptance criteria not met
  • Repeated faults or unexplained behaviour
  • Missing prerequisites (network access, utilities, approvals, upstream or downstream readiness)

Make commissioning consistent with Ocasta

Ocasta replaces informal, inconsistent commissioning notes with a structured checklist your teams can run on any device. You get standard questions, clear stop points, and a reliable audit trail — while teams get the confidence of knowing what to check next, in the moment.

Disclaimer: This checklist is for general guidance only and does not constitute legal, regulatory, health and safety, or professional advice. You are responsible for ensuring compliance with applicable laws, standards, and internal policies.

Included questions

Here's what's included in this commissioning checklist:

Job details and scope (5)

Confirm what you’re commissioning, where it is, and what “done” looks like before you start.

  • Text

    Job reference or work order number

    Use the identifier your team will search for later.

  • Text

    Site name and exact location

    Include area, room, bay, or asset location.

  • Text

    Asset or equipment ID

    Serial number, tag, or barcode.

  • Dropdown

    What type of commissioning is this?

    Pick the closest match to keep reporting consistent.

    Options: New installation, Replacement like-for-like, Upgrade or modification, Recommissioning after downtime, Other
  • Yes/No

    Acceptance criteria confirmed and understood

    You know what tests must pass and what evidence is required.

Pre-commissioning preparation checks (10)

Stop guesswork before it starts — confirm safety, prerequisites, and the right information on hand.

  • Yes/No

    Risk assessment completed for the task and location

    Include any site-specific hazards and controls.

  • Dropdown

    Permit to work required?

    If required, confirm it is issued and active before proceeding.

    Options: Not required, Required and in place, Required but not in place
  • Yes/No

    Isolation and lock-out tag-out (LOTO) plan confirmed

    Know what needs isolating, who authorises it, and how it is verified.

  • Yes/No

    Correct PPE available and being used

    Match PPE to the risk assessment and site rules.

  • Yes/No

    Tools and test equipment available and in date

    Include calibration status where relevant.

  • Yes/No

    Latest drawings, manuals, and commissioning procedure available

    Avoid working from old versions or local copies.

  • Yes/No

    Required spares and consumables on site

    For example: fuses, filters, seals, labels, fasteners.

  • Yes/No

    Site access, escorts, and access windows confirmed

    Include out-of-hours approvals if needed.

  • Dropdown

    Dependencies available and ready

    If any dependency is missing, pause and escalate.

    Options: All available, Some missing, Not sure
  • Text

    Dependency notes (if not all available)

    List what’s missing (power, network, utilities, upstream/downstream equipment, approvals).

Installation and configuration checks (8)

Confirm the basics are right before you energise or run functional tests.

  • Yes/No

    Visual installation check completed and passed

    No obvious damage, missing parts, loose fixings, or incorrect orientation.

  • Yes/No

    Labels and asset tag present and legible

    Include safety labels and identification labels.

  • Yes/No

    Mechanical connections verified

    Couplings, mounts, guards, fasteners, alignment (as applicable).

  • Yes/No

    Electrical connections verified

    Correct terminations, earthing, and protection devices in place (as applicable).

  • Dropdown

    Utilities connected and verified (as applicable)

    For example: water, gas, air, hydraulic, drainage.

    Options: Not applicable, Connected and verified, Connected but not verified, Not connected
  • Dropdown

    Network or system connectivity status (if applicable)

    If connectivity is required for operation, treat uncertainty as a stop point.

    Options: Not applicable, Connected and tested, Connected but not tested, Not connected
  • Yes/No

    Configuration matches the specification

    Settings, parameters, firmware versions, and setpoints are correct.

  • Yes/No

    Safety devices present and correctly fitted

    Guards, interlocks, emergency stops, signage, and barriers as required.

In-process commissioning checks (8)

Run tests in a controlled order and capture evidence. If anything is unclear, pause and escalate.

  • Yes/No

    Pre-power checks completed

    Isolation verified, correct supply, correct protection, and safe to energise (as applicable).

  • Yes/No

    Initial power-on successful with no alarms or faults

    Record any alarms even if they clear.

  • Text

    Alarm or fault codes (if any)

    List codes and what you did next.

  • Dropdown

    Functional test outcome

    Test against the procedure and acceptance criteria.

    Options: Passed, Passed with minor issues (not impacting operation), Failed, Not completed
  • Dropdown

    Performance test outcome

    Throughput, accuracy, response time, or other agreed measures.

    Options: Not required, Passed, Failed, Not completed
  • Dropdown

    Safety test outcome

    Emergency stop, interlocks, guarding, and safe state behaviour (as applicable).

    Options: Not required, Passed, Failed, Not completed
  • Yes/No

    Evidence captured for key tests

    Photos, screenshots, readings, or logs as required by your process.

  • Text

    Test notes and readings

    Record any measurements, observations, and what “good” looked like.

Escalation criteria and stop points (7)

If any of these apply, stop and escalate. Don’t push through uncertainty.

  • Yes/No

    Any safety risk identified that is not controlled

    If yes: stop work and follow your safety escalation route.

  • Yes/No

    Permit, isolation, or LOTO issue identified

    If yes: do not energise or continue testing.

  • Yes/No

    Any acceptance criteria not met

    If yes: record the failure, raise a defect, and agree next steps before retrying.

  • Yes/No

    Repeated faults or unexplained behaviour observed

    If yes: stop and escalate to engineering or the supplier.

  • Yes/No

    Missing dependency blocks commissioning

    For example: network access, utilities, approvals, upstream or downstream readiness.

  • Person

    Escalated to

    Select the person accountable for next steps.

  • Text

    Escalation summary

    What happened, what you’ve checked, and what you need to proceed.

Close-out and handover (9)

Leave the site safe, the paperwork complete, and the next team confident.

  • Yes/No

    Work area left clean, safe, and free of tools and waste

    Remove temporary barriers only when it is safe to do so.

  • Dropdown

    Temporary controls removed or formally handed over

    For example: temporary isolations, bypasses, temporary signage.

    Options: Not applicable, Removed, Handed over with approval, Still in place (requires follow-up)
  • Dropdown

    Documentation updated

    Update records so the next person doesn’t have to guess.

    Options: Completed, Partially completed (follow-up needed), Not completed
  • Yes/No

    Handover completed with the responsible owner

    Confirm who owns the asset from this point and any limitations or watch-outs.

  • Dropdown

    Operator training or briefing completed (if required)

    If not completed, record who needs what and by when.

    Options: Not required, Completed, Scheduled, Not completed
  • Yes/No

    Open actions logged with owners and due dates

    No loose ends — capture actions clearly.

  • Dropdown

    Commissioning status

    Choose the outcome that matches what you can evidence.

    Options: Commissioned and accepted, Commissioned with limitations (accepted with actions), Not commissioned (failed or incomplete)
  • Text

    Sign-off name and role

    Person accepting the commissioning outcome.

  • Signature

    Sign-off signature

    Capture sign-off at the point of handover.